Pages
Construction progresses on new £15m Belper Health Centre
https://dchs.nhs.uk/news/construction-progresses-new-15m-belper-health-centre
Alan Blair’s retirement
https://dchs.nhs.uk/my_dchs/show-me/staff-news-my-download/alan-blairs-retirement
Diabetes services
We provide two services for people with diabetes - Community Diabetes for people with Type 1 & Type 2 diabetes and our Diabetes Education service for people with Type 2 diabetes in Derby and Derbyshire. Each service is designed and selected according to individual requirements.
https://dchs.nhs.uk/our-services-and-locations/a-z-list-of-services/diabetes-services
Files
Disclosure Ref 2025191 - Contact details for Decontamination & Infection Control leads .pdf
FOI disclosure relating to contact details for DCHS Decontamination Lead, Infection Control Lead, Endoscopy Decontamination Manager and Estates Manager
Disclosure ref 2025220 - Contact details for legal correspondence from third parties.doc
Freedom of information disclosure relating to contact details for legal correspondence from third parties
Safe to Wait SOP for Band 3 HCAs (S76)
The rationale for introducing a “Safe to Wait” process is, for when patients present to UTC Services, the first point of contact will usually be the Reception/HCA staff. The Safe to Wait Guidance will be undertaken by Health Care Assistant (Band 3) staff following specific training and a period of demonstrating competence for the assessment of patients attending the UTCs with specific conditions/injuries. This will ensure that Band 3 HCA’s are aware of “Red Flag Signs”, and symptoms that indicate that someone presenting at the unit may require immediate or urgent attention.
Supporting Maintaining Attendance (SAMA) Policy Transition to New Procedure Letter.docx
Supporting Maintaining Attendance (SAMA) Policy Transition to New Procedure Letter
Annual Leave Calculator for GP's 2026-2027.xlsx
Annual Leave Calculator for GP's 2026-2027
TPP544-0037 - Inpatient Falls Multifactorial Risk Assessment
Inpatient Falls Multifactorial Risk Assessment
0111 - Intensive Support Team - Risk Levels Tool
0111 - Intensive Support Team - Risk Levels Tool
L94 - Staying Steady - How to reduce your risk of falling
L94 - Staying Steady - How to reduce your risk of falling. Patient and carers information leaflet produced by Age UK (Feb 2022).
OPAT Elastomeric Infusor Devices Standard Operating Procedure for DCHS Community (S38)
This SOP describes the process for administering an IV antibiotic using an elastomeric infusor device supplied via Derby Teaching Hospital Pharmacy Dept (South) or Chesterfield Royal Hospital Pharmacy Dept (North
Transfer of Care Protocol (S14)
1.1 The purpose of these joint procedures is to minimise delays for all adult patients assessed as fit for transfer including those who need Care Packages at home, permanent Care Home Placements whether publicly funded, self-funded, or fully funded by NHS Continuing Care or Terminal Care as described in the NHS Continuing Care National Framework (Revised November 2018.) These procedures will ensure efficient bed utilisation.